Baker Hughes Druck ADTS 542F Manual Del Usuario página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 41
3. ADTS5xxF
6
Note: See Figure 8 for other variants.
3.1 Power-Up Test (see Figure 6)
1.
Fit "Pitot" (Pt) (1) and "Static" (Ps) (2) port blanks.
2.
Ensure that the test set is connected to an external power supply and the supply is switched
on.
3.
Use the On/Standby Switch (3) on the front of the test set to switch the test set on. The test
set performs a self test, resulting in a test set status indication (4a) "Pass" or "Fault".
1
3
Figure 6: ADTS542F Front Panel
2
5
8
English–ADTS Safety and Installation Guide | 7
4
7
Copyright 2014 Baker Hughes Company.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Druck adts 522fDruck adts 553fDruck adts 554f

Tabla de contenido