VALVES
Remove the dish washer (if required),
S
washer and nut from the end bodies.
Apply a bead of plumbers putty around
S
the underside of the escutcheons.
Insert the end bodies into the
S
mounting holes from the top of the
bidet. Ensure the end body marked
cold is installed in the right-hand hole
(as viewed from the front of the bidet).
Install the dish washer (if required),
S
washer and nut to the bottom of the
end bodies.
Align the end bodies so that the
S
copper tubing faces to the outside.
Wrench-tighten the nuts.
S
Remove any excess plumbers putty.
S
Thread the two short metal hoses to
S
the end body outlets. Tighten the
hoses securely.
TRANSFER VALVE/VACUUM
BREAKER
Slide the nut and compression sleeve
S
on the adapter.
Kohler Co.
Escutcheon
Apply Plumbers
Putty
End Body
End Body
Outlet
O-Ring
Compression Sleeve
Nut
Adapter
5
End Body
Dish Washer
(When Required)
Washer
Nut
Dish Washer
Washer
Nut
Dish Washer
Short Metal
Hose
1010448-2-D