Figure 9
TOOLS NEEDED
or
Wrench
NOTE: Eight 1/4" thread diameter lag screws
required (not included). Length determined by
wall material/thickness.
NOTE: Cabinets must be completely
assembled before mounting onto wall.
1.
Place the L-brackets (9) on the top panel of each
assembled cabinet. (See Figure 11) Once in desired
position, screw the L-brackets (9) into the top of the
cabinet using 1/4" lag screws.
Figure 11
PAGE 3 OF 9
ASSEMBLY CONTINUED
8
Bottom
OPTIONAL WALL MOUNTING
Socket Wrench
Lag Screw
9
1-800-295-5510
uline.com
11. Lay the cabinet gently on its back with the two door
panels facing up, and place the second I-beam
lock (8) in the corresponding snap lock wells on the
bottom of both base panels. (See Figure 9)
12. (Optional) Peel and stick door label. (See Figure 10)
Figure 10
Door Label
2. Place the cabinet (with L-brackets attached) against
the desired wall. Once in position, use four more
1/4" lag screws and screw them into the L-brackets
(9) and wall. Tighten screws until cabinet no longer
moves when pushed on. (See Figure 12)
Figure 12
Lag Screw
CA UTI ON
ACI DS/C ORR OSI VES
PRECA UIÓN
ACIDO /CORR OSIVO
ATTEN TION
ACIDE /CORR OSIF
0721 IH-5660