Strainer Pot Service; Electrical Shock Hazard - Jandy JCP Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 10
ENGLISH
Wire sizing, wire type, branch circuit fuse protection,
motor starter, control equipment, and related items
must meet National Electrical Code and local code
requirements.
Motors are supplied by several manufacturers and
nameplate data (service factor, maximum amperage,
etc.) will vary. Consult control manufacturer and motor
nameplate on your pump to correctly choose and size
motor starter and control equipment for your particular
installation. Specific electrical questions or problems
should be addressed to the manufacturer of the electrical
component in question.
Emergency Shutoff
Install an Emergency Shutoff Switch near pool. Clearly
mark this switch and mount it in a location that is
accessible to bathers or pool operating personnel
(e.g. lifeguards). Make sure that all lifeguards and
pool personnel understand the switch's use in case of
emergency (entrapment, electrical malfunction, etc.).
3.5

Strainer Pot Service

1.
Make sure the pump is turned off if it is being
controlled by a variable frequency drive.
2.
Make sure the circuit breaker that powers the pump
motor is turned off.
The pump must be permanently connected to a
dedicated electrical circuit. No other equipment,
lights, appliances, or outlets may be connected to the
pump circuit.

ELECTRICAL SHOCK HAZARD

Turn off all switches and the main breaker in the
pump electrical circuit before starting the procedure.
Failure to comply may cause a shock hazard resulting
in severe personal injury or death.
ELECTRICAL SHOCK HAZARD
Due to the potential risk of fire, electric shock, or
injuries to persons, Jandy
in accordance with the National Electrical Code
(NEC
), all local electrical and safety codes, and
®
the Occupational Safety and Health Act (OSHA).
Copies of the NEC may be ordered from the National
Protection Association, 1 Batterymarch Park, Quincy,
MA, 02169, or from your local government inspection
agency.
In Canada, Jandy pumps must be installed in
accordance with the Canadian Electrical Code (CEC).
Jandy
JCP Series High Performance Commercial Pumps
®
CAUTION
WARNING
WARNING
Pumps must be installed
®
®
3.
Make sure all necessary isolation valves are closed
to prevent pool water from reaching the pump.
4.
Carefully remove the plug and O-ring seal located
in the center of the lid. This will allow the pressure
inside the pump to equalize with the pressure in the
room.
IMPORTANT NOTE: Failure to remove the
lid's center plug before service will significantly
increase the difficulty of assembling or
disassembling the lid and may cause the lid's lifting
tabs to break.
5.
Follow the markings on the locking ring. Using
both handles, slowly turn the locking ring
counterclockwise until the lid and locking ring
disengage from the pump housing. See Figure 8.
Figure 8.
Disengage Lock Ring
Notch
Figure 9.
O-ring in Lid Assembly
|
Installation & Operation Manual
Seal

Publicidad

Tabla de contenido
loading

Tabla de contenido