First Ignition; Pellet Loading - Palazzetti INSERIMENTI A70 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

8

FIRST IGNITION

The first ignition must be carried out
by the installer.
8.1

Pellet loading

The pellets must be loaded from a door which
must be provided in the hood of the cladding
and connected to the appliance through the
appropriate accessories (optional), carefully fol-
lowing the assembly instructions
Do not use the extraction system of the
appliance as a means to load the pellet
hopper.
The use of non-original accessories is
not recommended.
Pellets falling outside the hopper may
damage the operation of the appliance
and cause fires.
The pipe for pellet loading (optional) must act
exclusively as a ramp to fill the hopper of the
appliance and not as an extension of the hopper
itself; avoid loading more pellets than the hopper
can hold.
8.1.1 Optionals available
• Loading system with flexible metal pipe and
loading door "1" (Fig. 38 - Fig. 39).
• Front loading drawer for channelled air outlet
version "2" (Fig. 38).
• Front loading drawer for front air outlet version
"3" (Fig. 39).
• Pedestal kit "4" and finishing frames for plas-
terboard "5" (Fig. 40).
004778740 - 14/06/2021
ITALIANO
ENGLISH
FRANÇAIS
AC70
A70
A70 AC70
5
4
DEUTSCH
ESPAÑOL
1
2
Fig. 38
1
3
Fig. 39
Fig. 40
71

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Inserimenti ac70

Tabla de contenido