Installation; Unpacking And Inspection - Tripp-Lite BP240V09 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Installation

Note: Before installation, inspect the unit. Ensure nothing inside the package is damaged. Retain the original packing material
in a safe place for future use.

5.1 Unpacking and Inspection

Any damage to packaging should be noted with the delivery carrier at the time of receipt.
Remove the rail kit, battery enclosure, and battery modules from the packaging.
Note: The battery modules are very heavy. Be cautious when unpacking and lifting the unit to avoid injury.
• Don't tilt the battery pack when removing it from the packaging.
• Inspect the battery cabinet for damage that may have occurred from transport. If damage is found, do not turn on the unit.
Immediately contact the dealer from whom the unit was purchased.
• Check the accessories according to the packing list and contact the dealer in case of missing parts.
For Battery Cabinet Models BP240V09, BP240V09K, BP240V09-NIB
1. Remove the packing tape with scissors.
3. Remove the inner carton, unfasten and remove the
screws securing the cabinet to the shipping pallet.
2. Remove the outer carton.
4. Place the incline board on the floor. Use the screws
unfastened in step 3 to fasten the incline board to the
pallet.
18

Publicidad

Tabla de contenido
loading

Tabla de contenido