We value your experience using Sunny Health and Fitness products. For assistance with parts or
troubleshooting, please contact us at support@sunnyhealthfitness.com or 1-877-90SUNNY (877-
907-8669).
#75 M10*15*S6 4PCS
#90φ10.5*φ20*2.0 4PCS
75
75
90
90
93
#79 M10*25*S6 4PCS
#74φ10.5*φ20*2.0 4PCS
79
74
79
74
6
ASSEMBLY INSTRUCTIONS
S6
75 75
90
90
92
1
S6
5
1
STEP 1:
#95
Unscrew 4 Hex Socket Head Bolts (No. 75)
from Main Frame (No. 1) with Allen Wrench
(No. 95). Remove 4 Flat Washers (No. 90),
the Rear Shipping Tube (No. 93), and Front
Shipping Tube (No. 92) from Main Frame
(No. 1).
You may save these parts [Hex Socket Head
Bolts (No. 75), Flat Washers (No. 90), Rear
Shipping Tube (No. 93) and Front Shipping
Tube (No. 92)] in case you would like to
repackage and transport this equipment in the
future.
STEP 2:
#95
Attach the Front & Rear Stabilizers (No. 5 &
No. 6) to the Main Frame (No. 1) using 4 Hex
Socket Bolts (No. 79) and 4 Flat Washers
(No. 74). Tighten and secure with Allen
79
79
Wrench (No. 95).
74
74
9