Pre-Operation.CHecklist - Mi-T-M BIO-20R-0M10 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TO ENsURE yOUR WATER RECyClE TREATmENT sysTEm OpERATEs
sAfEly AND EffICIENTly, COmplETE ThE pRE-OpERATION ChECklIsT
Before proceeding, answer all the questions on this checklist.
CODES:
. Does the electrical wiring meet all codes?
2. Does plumbing meet all codes?
.
LOCATION:
1. Is the unit located on a hard level surface free of flammable vapors,
combustible dust, gases or other combustible materials?
2. Is the unit located in a large ventilated area?
.
ELECTRICAL:
. Is the unit properly grounded?
2. Does the power supply, voltage and amperage match the data plate?
.
PLUMBING:
. Is the plumbing sized correctly?
2. Are all plumbing connections secure?
.
GENERAL:
. Have all operators using this unit read and understood this entire manual?
2. Has the unit been installed by qualified service people who followed the
instructions listed in this manual?
IF."NO".WAS.MARKED.TO.ANY.OF.THESE.QUESTIONS,.CORRECT.THE.SITUATION.BEFORE.OPERATING.

STOP
bEfORE pROCEEDING.
PRE-OPERATION CHECKLIST
YES
NO
Operator's Manual

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Bio-20r-1m10Bio-20r-0m30Bio-20r-1m30Wx-0088

Tabla de contenido