Winterizing; To.OPerate.UNit.AFter.WInterizing - Mi-T-M BIO-20R-0M10 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WINTERIZING:

. Turn all switches on the Control Panel to the off position and disconnect power to the Control Panel.
2. Shut off all water connections to the Biological Recycling System
3. Remove the drain plug from the Transfer Pump.
. Remove the drain plugs from the Biological Tank, clean the tank and Biological Media and wipe down the system.
5. Open all valves on the Manifold.
6. Loosen the Freshwater Make-up connection, Pressure Washer Outlet connection, Rainwater Overflow connection
and Tank Inlet connection.
7. Open the check valve near the Sump Pit and drain the water transport line. Remove the Sump Pump from the Sump
Pit.
8. Store all chemicals at room temperature.
TO OPERATE UNIT AFTER WINTERIZING:
. Follow Installation Instructions on page 6.
2. For ease of reinstalling Biological Media, place media at an angle. After media is replaced, the Hold Down Angles
must be fastened into the Biological Tank before filling. This prevents the Biological Media from rising out of the tank
and also supports the tank sides.
3. Follow Prestart Procedures on page 9.
. Follow Start-up Procedures on page 9.
5. Follow Procedures for adding Microbes on page 20.
BIOLOGICAL.MEDIA.INSTALLATION
REF..#
DESCRIPTION

Stra p
2
B i o lo g i c a l Me d i a
3
B i o lo g i c a l Ta nk
Operator's Manual
MAINTENANCE
7

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Bio-20r-1m10Bio-20r-0m30Bio-20r-1m30Wx-0088

Tabla de contenido