Descargar Imprimir esta página

VMB TE-063 Manual De Instrucciones página 9

Torre elevadora

Publicidad

Idiomas disponibles

Idiomas disponibles

towerlift outdoor and require a wind speed calculation please con-
4. USER INSTRUCTIONS.
4.1 -
in the area it is to be used with the help of
the transport wheels (T).
4.2 -
remove the legs (P) from their transport
compartment (S) and fully insert them into
4.3 -
tion using the spirit level (L) at the base of
the tower, adjust the stabilizer (Q), turning
the handle (H) if necesary.
4.4 -
4.5 - DO NOT OVERLOAD THE LIFT.
MAXIMUM LOAD IS 270 kg (595 lb) TL-063
The lift should NEVER be overloaded.
sue. Place the load onto the lift using an
adequate VMB support according to the
need, use so that the weight of the load
will only be elevated in a vertical direction.
The minimum load is 25 Kg.
PRO LIFTS S.L.
WIND SPEED CALCULATIONS
K) and
V
R).
-
F) and place them
-
Depósito legal y copyright. Todos los derechos reservados.
ENGLISH
4.6 - How to place the load:
Always load as close to the tower as
possible. The maximum load diminishes
according to the distance from the body
of the tower as illustrated in the diagram
4.6.1, which shows the load on the gravity
centre with distances to the lifting carriage
at a maximum lifting. Use a VMB adaptor
if necessary.
CAUTION
When two towers are used to elevate a
truss bridge, or many towers to elevate a
structure of any type, it is almost impossi-
ble that two or more people coordinate the
winches elevating or lowering the loads, at
exactly the same pace. At a certain point
each tower will be extended to different
height. For this reason it is necessary that
the structure does not stretch and allows
for these differences.
from the handle of the winch will deform
the structure and apply a lateral force to
-
9

Publicidad

loading