ATLAS D32 CONDENS K130 UNIT
4.2 Commissioning
B
Checks to be made at first lighting and after all maintenance operations that in-
volved disconnecting from the systems or an operation on safety devices or
parts of the boiler:
Before lighting the boiler
Open any on-off valves between the boiler and the systems.
Check the tightness of the fuel system.
Check the pre-filling of the expansion tank
Fill the water system and make sure that all air contained in the boiler and the sys-
tem has been vented by opening the air vent valve on the boiler and any vent valves
on the system.
Make sure there are no water leaks in the system, hot water circuits, connections or
boiler.
Make sure the electrical system is properly connected and the earth system works
properly.
Make sure there are no flammable liquids or materials in the immediate vicinity of
the boiler.
Fit the pressure gauge and the vacuum gauge on the pump (remove after starting)
of the burner.
open the gate valves along the diesel pipe
Lighting
A
P
B
P
fig. 35 - Startup
A
When the thermostatic line closes, the burner motor starts turning together with the
pump: all the oil sucked is sent to the return. The burner blower and the ignition trans-
former are also working, therefore the following stages are carried out:
firebox preventilation.
prewash of a part of the oil circuit.
preignition, with discharge between electrode tips.
B
At the end of prewash, the unit opens the electromagnetic valve: the oil reaches the noz-
zle, where it is finely sprayed.
Its contact with the discharge between the electrode tips creates the flame.
The safety time begins simultaneously.
Unit cycle
A’
A
R
SB
W
OH
OW
M
tw
Z
BV
FR
fig. 36 - Unit cycle
R-SB-W Thermostats/Pressure switches
OH
Oil preheater
OW
Operation enabling contact
M
Burner motor
Z
Ignition transformer
BV
Electromagnetic valve
FR
Photoresistance
A'
Starting with preheater
A
Starting without preheater
B
Flame presence
C
Normal operation
D
Adjustment stop (TA-TC)
VE
G
VE
G
B
C
t3n
t1
t3
TSA
t1
Preventilation time
TSA
Safety time
t3
Preignition time
t3n
Postignition time
tw
Preheating time
Unit output signals
Necessary input signals
Checks during operation
Ignite the appliance as described in sec. 2.3.
Check that the fuel circuit and water systems are airtight.
Check the efficiency of the flue and air-fume ducts while the boiler is working.
Check that the water is circulating properly between the boiler and the systems.
Check the proper ignition of the boiler by performing various tests, turning it on and
off with the room thermostat or remote control.
Check that the burner door and fume chamber are tight.
Check that the burner works properly.
Analyse the combustion (with the boiler unit stable) and check that the content of
CO
in the fumes is between 11% and 12%.
2
Check the parameters are programmed correctly and perform any required custom-
ization (compensation curve, power, temperatures, etc.).
4.3 Maintenance
Periodical check
To ensure proper operation of the unit, have it checked yearly by qualified personnel,
providing for the following:
The control and safety devices must function correctly.
The fume exhaust circuit must be perfectly efficient.
Make sure there are no obstructions or dents in the fuel supply and return pipes.
Clean the fuel intake line filter.
Check correct fuel consumption
Clean the combustion head in the fuel outlet zone, on the turbulence disc.
Leave the burner operating at max. for about ten minutes, then analyse the combus-
tion, checking:
-
Correct setting of all the elements specified in this manual
-
Fume temperatures at the flue
-
CO2 percentage content
The ducts must be free of obstructions and leaks
The burner and exchanger must be clean and free of deposits. For cleaning, do not
use chemical products.
The fuel and water systems must be tight.
The water pressure in the system when cold must be approx. 1 bar; otherwise bring
it to that value.
The circulating pump must not be blocked.
The expansion tank must be filled.
Check the magnesium anode and replace it if necessary.
The boiler casing, control panel and aesthetic parts can be cleaned with a soft
A
and damp cloth, if necessary soaked in soapy water. Do not use any abrasive
detergents and solvents.
Burner disassembly
Remove the casing (B) by undoing the screw (A), thus making all the accessories
accessible.
Undo the nut (C) and position the burner in order to access the nozzle.
D
1
8
3
3
6
7
4
11
12
cod. 3541G840 - Rev. 01 - 10/2016
C
fig. 37 - Burner disassembly
A
B
51