Start Up - Truper BOPA-1/2 Manual De Instrucciones

Bomba periférica autocebante
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Electric Connection
• Call a professional electrician to set up the electric
connections to the power source (G), meeting the
mandatory directives.
• The fixed installation shall incorporate a device that
assure the omnipolar connection of energy.
• Make sure the electric requirements described in this
Manual and in the pump nameplate match the power
supply capacity values.
• Connect the pump in a physical ground circuit. Then,
connect the phases according to the electric diagram in
page 3 or in the pump nameplate.
• The pump is built with a one-phase motor protected
against overcharge using a thermal device (overcurrent
cut) set in the winding.

Start Up

Purge
• The first time the pump is started or after a long period
H
of inactivity or when air entered into the system, fill the
pump with clean water before starting up.
• Remove the purge cap (H) and fill with water up to the
orifice level.
• Screw on the cap and start the pump.
Never start the pump when empty. If
WARNING
accidentally is started, turn OFF the pump immediately,
wait it cools down and then fill using clean water.
7
ENGLISH

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Bopa-3/4Bopa-1127801278112782

Tabla de contenido