Chapin 61575 Manual De Uso Y Cuidado página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DISASSEMBLING AND REPAIRING THE SHUT OFF VALVE
Figure 1
A
Figure 2
Valve
Stem
B
C
Figure 3
1) Assembled shut-off valve (Figure 1).
2) Remove the retaining pin (A) (Figure 2) place the notched end
of the retaining pin on a hard surface and push down. Remove
the retaining pin and slide the handle off the valve.
3) Remove the retaining nut (o-ring attached), spring, and valve
stem (B) (Figure 3). Replace worn parts. Lubricate the O-rings
and reassemble by reversing the steps above. Place the handle
groove in the slotted area of the valve stem and make sure the
locking clip is positioned in the neutral position (see "Helpful
Spraying Information" section). Insert the retaining pin. Push
down on the handle a few times to distribute the lubricant
evenly. Check filter (C) in end of shut-off valve for debris.
Remove filter and flush with water to clean out.
9E

Publicidad

Tabla de contenido
loading

Tabla de contenido