7. Starting, operation
7. Starting, operation
Required tools: wrench (flats 19 and 16), screw driver (0.040" to 0.060" / 1 to 1.5 mm) and a pair of scissors,
allen key for WU-16
Mechanical connection
Don't use this
spanner flat
Use this spanner flat
for screwing in
Remove the protection cap only just before installation.
■
When mounting the instrument, ensure that the sealing faces of the instrument and the measuring point
■
are clean and undamaged.
Do not scratch or nick the bead. Do not over tighten. Damage to the bead will affect the fitting's perform-
■
ance and may cause leakage in the system.
Screw in or unscrew the instrument only via the flats using a suitable tool and the prescribed torque. The
■
appropriate torque depends on the dimension of the pressure connection and on the sealing element used
(form/material). Do not use the case as working surface for screwing in or unscrewing the instrument.
When screwing the transmitter in, ensure that the threads are not jammed.
■
WIKA Operating instructions/Betriebsanleitung/Mode d'emploi/Instrucciones de servicio WU-1X
Product label (example)
Signal
Power Supply
S# Serial No.
P# Product No.
GB
PIN assignment
7