Ceado E7 Manual De Uso Y Mantenimiento página 22

Moledor-dosificador
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

22
The EC declaration of conformity for this appliance is available in the Products section of our
website www.ceado.com.
INSTALLATION
Comply with the safety recommendations indicated above and hereafter when installing the
appliance.
For the installation of the appliance, qualified personnel must be present who are able to check the
fineness of the grind.
1.
Make sure that the mains voltage is as indicated on the rating label of the appliance and that
the electrical system is grounded and equipped with a switch.
2.
Install the appliance in a DRY, PROTECTED place, far from water sprays and jets, heat
sources, open flames and inflammable substances.
Place the appliance on a flat, horizontal, stable surface where it cannot tip over.
3.
Put the tray under the doser to keep the work area as clean as possible.
Before connecting the plug to the power socket, make sure that the ON-OFF switch
(8 Fig. 2) is in position "0" (OFF).
4.
Connect the external equipotential terminal
available) to an equipotential node.
5.
Plug the power cable into a socket protected by a suitably rated circuit breaker (MCB) or fuses.
Do not use an adaptor plug.
6.
Stretch the power cable out to full length. Do not let it pass over sharp edges or hot surfaces.
Do not let oil spill on it. Do not let the power cable hang loose from the counter on which the
appliance stands.
7.
Make sure that the bean hopper is correctly positioned and that its shutter (7 Fig. 4) is
completely open (to the last click).
8.
To fit the coffee press, refer to the paragraph "Assembly of press" - page 26.
under the motor housing of the appliance (if
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E8E9E15

Tabla de contenido