Fitting Inlet; Connecting Inspection Channel - Graf ECOBLOC INSPECT 420 Instrucciones Para El Montaje

Ocultar thumbs Ver también para ECOBLOC INSPECT 420:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Once all the blocks are positioned, the system is
fully wrapped in geo textile. This prevents the in-
gress of dirt particles into the system.
Please note:
There is an increased risk of slipping on EcoBloc Inspect system in frosty and wet conditions.
7.4

Fitting inlet

On the inlet surface, an X is cut into the geo textile.
The inlet pipe is slid in around 20 cm and the rest
of the X cut glued or welded to the pipe.
The vents needed are produced in the same way.
The vertically aligned vents can be produced on
the horizontal drill surface using a 90° KG bend.
7.5

Connecting inspection channel

The bases of the EcoBloc Inspect system can be
inspected and driven on. Please use the bottom
connections in the end plates of the EcoBloc In-
spect to connect the inspection channel
7. Installation
29 / 69

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

402000

Tabla de contenido