GB
installation
INSTALLING THE APPLIANCE
2 lifting rings on the upper part of the appliances allow them to be
installed using a crane. The use of connections is forbidden.
• Remove the transparent bubble wrap which protects the product
duringtransport, takingcarenottodamagetheproduct'sinsulation
(do not use a cutting tool)
• Remove the bolts securing the product on the pallet.
• Place the tank and its safety unit (and/or safety valve) in a location
protected from freezing conditions (not supplied by the tank
manufacturer).
• Position it as close as possible to important catchment points.
•
• If it is placed outside the living space, fit heat insulation to the
pipes. If the appliance must be installed in an area where the
ambient temperature is constantly above 35°C, provide ventilation
for the area.
CKZ, CK1, tanks only operate in the vertical position
FITTING THE JACKET
• Ensure that the support component can withstand the weight of
the water tank when full.
• Leave a minimum space of 1.20 metres at the front to allow for
periodic maintenance (see diagram opposite).
• Install a retention container with drainage beneath the tank
if it is positioned in a suspended ceiling or attic, or above a
living space.
• The safety unit and/or safety valve must be accessible.
• A drainage function equipped with a funnel and connected to the
main drain is required.
• The bottom connection allows the tanks to be fully drained.
• All unused connectors must be capped
• To prevent leaks, ensure that the hoses are not placed under any
mechanical stress!
It is strongly recommended for 2 people to fit the tank insulation.
Place the centre of the jacket upright against the tank.
Fold down the two ends of the jacket against the tank, ensuring that
the connection openings are correctly aligned.
Pull the zip down a few centimetres then gradually close it, holding
the insulation securely.
Once the tank is fully enclosed, fold the end of the zip inside the insu-
lation.
Place the insulation disc at the top of the product and finally position
the plastic cover.
WARNING:
To avoid damaging the zip during fitting, it is recommended to hold
the two ends of the jacket as close as possible as you pull the zip
down. Ensure that there is not too much pressure on the zip fastening
.
THE TEMPERATURE OF THE MATERIAL MUST BE AT LEAST 20 °C. IF
LESS IT'S ESSENTIAL TO HEAT THE INSULATION BEFORE ASSEMBLY.
GB
31