Descargar Imprimir esta página

Samoa 506 Serie Guía De Servicio Técnico Y Recambios página 3

Publicidad

GB
• Clamp the hose reel firmly to a work bench.
• Pre tension the hose reel power spring by rotating the spool:
10m spring: 16 turns
15m spring: 19 turns
15m HD spring: 21 turns
• Introduce the hose end to fix to the hose reel through the
outlet guide and then through the opening in the drum of the
spool. Pull the hose through the drum towards the swivel.
• Fix the hose to the swivel as indicated in figure 8a and fix the
U bolt as shown in figure 8b.
• Fix the hose stop to the free end of the outlet hose.
• Pull out the hose slightly to free the spool latch and then gradually
release the hose to allow the hose reel to wind up the hose.
• If the hose reel does not rewind satisfactorily then adjust the
tension of the power spring (see "Spring load adjustment").
Samoa Industrial, S.A. · Box 103 Alto Pumarín · 33211 Gijón - Asturias Spain · Tel.: +34 985 381 488 · Fax.: + 34 985 384 163
Hose installation / Instalación de la manguera
Fig. 6
Fig. 8a
E
• Sujetar el enrollador a una base firmemente.
• Aplicar, al enrollador sin manguera, las vueltas de pretensión
que se indican a continuación.
resorte para 10 m: 16 vueltas
resorte para 15 m: 19 vueltas
resorte para 15 m HD: 21 vueltas
• Introducir el extremo de la manguera por la salida del
enrollador y el orificio del tambor hasta llegar a la rótula.
• Fijar la manguera a la rótula como se indica en la Figura 8a y
colocar el abarcón según la figura 8b.
• Colocar el tope de manguera en el extremo libre.
• Liberar el trinquete tirando ligeramente de la manguera y
dejar que enrolle suavemente.
• Si es necesario ajustar la tensión del resorte, seguir las
instrucciones del apartado "Ajuste de la tensión del resorte".
Fig. 7
Fig. 8b
Fig. 9
3
R.11/10 850 812

Publicidad

loading