Installation
Installation Kits Contents
1
12
11
Suggested Tool Requirements
SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
3. Remove EPS Material.
4. Cut the window sash seal to the proper
length. Peel off the backing and attach the
foam-pe
to the underside of the window
sash.
5. Remove the backing from the top upper
guide Foam PE
of the upper guide
6. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
7. Insert the frame guides
the cabinet.
8. Insert the Frame Curtain
guide and frame guides
9. Fasten the curtains to the unit with 4 Type A
screws.
12 Room Air Conditioner
2
3
4
8
5
6
7
and attach it to the bottom
into the bottom of
into the upper
.
NO.
NAME OF PARTS
1
FRAME CURTAIN
2
SILL SUPPORT
3
BOLT
4
NUT
9
5
SCREW(TYPE A)
6
SCREW(TYPE B)
7
SCREW(TYPE C)
10
8
FOAM-STRIP
9
FOAM-PE
10
FOAM-PE
11
FRAME GUIDE
12
WINDOW LOCKING BRACKET
Upper guide
(Type A)
5
5
Q'TY
Shipping screws
EPS Material
Upper guide
5
(Type A)
12
2
2
2
2
16
3
5
1
1
1
2
1
12