Installation Of Connection Pipe - Electrolux EXI09HL1W Manual De Instalación

Bomba de calor inversor split
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Step 5: Installation of Connection Pipe
Refrigerant pipe connection
1 Flaring work
Main cause for refrigerant leakage is due to
work using the following procedure:
A: Cut the pipes and the cable.
Use the piping kit accessory (if applicable) or
pipes purchased locally.
Measure the distance between the indoor and
the outdoor unit.
Cut the pipes a little longer than the measured
distance.
Pipe
Oblique
B: Burr removal
Completely remove all burrs from the cut
downward direction as you remove burrs in
order to avoid burrs dropping into the tubing.
Face down
having completed burr removal.
13
All manuals and user guides at all-guides.com
Roughness
Burr
Pipe
Reamer
Flare nut
Copper tube
caution
D: Flaring work.
shown below.
Bar
Bar
Copper pipe
Clamp handle
Firmly hold copper pipe in a die according to
the dimension shown in the table below.
Outer diam. (mm)
Max.
1.3
1.6
1.8
E: Check
diagram.
If the pipe has any defect, cut off the enlarged
section and redo the work.
Smooth all around
Inclined
Even length all
around
Make an independent covering for each
pipe with the appropriate tubular isolation.
Handle
Yoke
Cone
Red arrow mark
A (mm)
Min.
0.7
1.0
1.0
2.2
Damaged
Cracked
Uneven
surface
thickness

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Exi12hl1wExi18hl1w

Tabla de contenido