Oudoor Unit Installation - Electrolux EXI09HL1W Manual De Instalación

Bomba de calor inversor split
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Outdoor Unit Installation
Step 1: Securing of Outdoor Unit
10 mm tightly (not included).
Place the outdoor unit over a horizontal
concrete or rigid surface (never directly over
grass or land).
Air inlet
Outdoor Unit
Dimension
mm(WxDxH)
caution
If a suspended installation is needed,
the installation bracket must allow the
The wall where the unit will be installed
must be of solid brick, concrete or
provided with other reinforcement ways
bracket to the wall and the bracket to
and leveled.
7
All manuals and user guides at all-guides.com
Air inlet
Air outlet
Dimension Dimension
286
286
368
Step 2: Outdoor Condensate Drainage
(only for heat pump model)
During heating operation, the condensate and
defrosting water should be drained out reliably
through the drain hose.
Install the outdoor drain connector in the drain-
water hole on the chassis of outdoor unit, and
attach the drain hose to the connector so that
the waste water formed in the outdoor unit can
be drained out.
The drain-water hole must be plugged.
Whether to plug other holes will be determined
by the installer according to actual conditions.
In case of a drain hose, the unit must be
installed on a base more than 3cm height.
Hose of inner dia. 16mm
(not provided)
Drain-water
hole
Chassis
Drain
connecter

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Exi12hl1wExi18hl1w

Tabla de contenido