Chapter 2 Preparation
Supplied Items
12
Chapter 2 Preparation
After you confirm that you have all of the required accessories for your
installation, connect the autoloader to the host computer (page 13), and select
the SCSI ID with the rotary switch on the rear panel (page 14).
When you first open the box, make sure it contains the following items.
Contact your supplier if anything is missing or broken.
• AIT Autoloader Unit
• Magazine
• Power Cable
• This Guide