KOBE PREMIUM IN-026 Serie Instrucciones De Instalación Y Manual De Operación página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Duct Work Installation
18. Determine and make all necessary cuts in the wall or ceiling
for the ductwork. Note: Install the ductwork before installing
the insert.
19. Use steel pipe to connect the exhaust on the hood to the
ductwork above. Use duct tape to make all joints secure and
air tight.
20. Please refer to local codes for the usage of a damper (not
included).
Wiring to Power Supply
SAFETY WARNING
RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD MUST BE
PROPERLY GROUNDED.
QUALIFIED
ELECTRICIAN
APPLICABLE NATIONAL AND LOCAL ELECTRICAL CODES.
BEFORE CONNECTING WIRES, SWITCH POWER OFF AT
SERVICE PANEL AND LOCK SERVICE PANEL TO PREVENT
POWER FROM BEING SWITCHED ON ACCIDENTALLY.
21. Connect electrical wires.
22. Connect three wires (black, white and green) to house wires
and cap with wire connectors. Connect wires according to
their colors (i.e. black to black, white to white, and green to
green).
23. Store wires in the wiring box.
Hood Installation
NOTE: USE HAND TOOLS ONLY.
SCREWS. IT MIGHT CAUSED DAMAGED TO THE HOOD.
24. Remove 10 screws located at the bottom of the insert (Refer to
Figure 11). Carefully remove the light support panel.
25. Position the insert inside the custom wood frame, and secure
the insert to the front and rear stud support ( Refer to Figure 2)
by using the front and rear mounting holes (Screws not
included).
26. For a more secure installation, use the mounting holes located
on the side of the insert
27. Make sure insert is secure before releasing.
28. Re-install the light support panel. (Do not over tighten screws.)
CAUTION
: MAKE SURE HOOD IS SECURE BEFORE
RELEASING.
MAKE SURE THIS IS DONE BY
IN
ACCORDANCE
DO NOT OVER TIGHTEN
9
Figure 9
Figure 10
WITH
ALL
Figure 11
Figure 12

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

In2630sqb-700

Tabla de contenido