Descargar Imprimir esta página

Pando E-295 Manual De Instalación página 22

Motor v.850 interior

Publicidad

Idiomas disponibles

Idiomas disponibles

INOXPAN S.L.
EN - Features and recommendations for ceiling-mounted hoods.
QUALITY ASSURANCE:
In order to ensure that your project does not come up against any unexpected difficulties, to ensure the
product works successfully.
FORM OF THE CEILING:
The "ideal" ceiling to install these hood units must be completely unobstructed and flat over all of its surface.
If for design reasons you choose to have different heights or steps in the ceiling, it must be ensured that the
suction losses (you must send us a plan to determine whether the surrounding ceiling is suitable).
CEILING HEIGHT:
The recommended distance between the floor and the hood is a maximum of 2.50 m. For greater heights
consult our Technical Division.
POSITION OF THE HOOD:
The hood must be centred over the cooking area.
AIR INTAKE GRILLE:
To ensure optimum suction by the hood it is essential that the kitchen has a constant inward flow of air; a
ventilation grille at floor level is the perfect solution for this.
INSTALLING THE FLUE PIPE:
We strongly recommend that you use S.E.C. System ® fume extractor flue pipes from Pando, as these
considerably improve convenience in use and the soundproofing of the unit.
INCLUDED:
All units with V.2450 Exterior and V.2350 Roof motors come with 5 m of S.E.C. System® fume extractor flue
with interior Ø 203 mm and exterior Ø 253 mm as standard.
EN-It must be taken into account and provide that the hood and peripherals must have easy and safe
access for possible maintenance or repair tasks of the official Pando technical service
(SAT). The guarantee will NOT cover the costs and means necessary for access to a product
that does not meet these conditions. In the event that the product is not easily accessible or
safe, a criterion that will be issued by SAT in its initial inspection, it will be the responsibility of
the client to place the means and assume the necessary costs so that the SAT can perform
the intervention adequately.
22

Publicidad

loading