Descargar Imprimir esta página

TOPINOX Ultravent VarioCooking Center 311 Manual Del Usuario página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 22
Dear customer,
please read this installation manual care-
fully before installing the hood.
Damages based on installation not comply-
ing with the directives given hereunder are
not covered by warranty terms..
Ultravent complete
Parts picture 1
Pos. Description
1 Support plate
2 Mounting frame
3 Supporting channel
4 Leg lower part
5 Leg upper part
6 Cover panel
7 HT-pipe
8 Lid HT-pipe
9 Mounting frame right
Parts picture 2
Pos. Description
10 Ultravent
Installation
1. Delivery
Carefully unpack the unit on delivery
and check to ensure that no damage
has been caused in transit (follow the
instructions on the packaging).
2. Installation
Attention
Observe the weight of the units.
Use carrying aid to avoid injuries.
Net weight:
Ultravent
112
145 kg
®
Ultravent
211
153 kg
®
Ultravent
311
246 kg
®
GB
- Place support plates (item 1) into the
- If alreday water and power connections
60.70.929
- Fit mounting frame right (item 9) next to
Qty. Article Nr.
2 36.004.029
1 36.004.028
2 36.004.027
4 12.00.224
- Slide the the right mounting frame as
4 12.00.205
2 36.004.106
1 60.70.897
1 2070.0053
1 36.004.507
- Remove cover panel (item 6) from sup-
1 60.70.930
- Unscrew legs (item 4/5)
- Put the supporting channel (item 3) on
- Make sure that the fold of the supporting
- Undo lower part of the legs until they
- Lift up the hood (item 9) and hold it to
- 20 -
bottom cross bar of the unit
(The folded edge must point to the rear
of the unit)
were made, disconnect them again from
the power console.
the power console and mounting frame
(item 2) next to the left base frame using
4 screws M10x25 and washers for each
mounting fame.
Do not yet tighten screws.
close as possible to the power console
and the left in a distance of 340 mm to
the right and tighten the screws.
porting channel (item 3).
Insert screw with washer into the upper
part of the leg and the hole of the lower
part of the supporting channel (item 3).
Fasten screw using M10 nut and wash-
er. Screw lower part of the leg
completely back in again.
the mounting frame and fasten it with 6
screws M8x16 and washers
channel sits on the upper side of the fold
of the mounting frame.
stand firmly
the supporting channel from the front
side
pic. 3
pic. 4
pic. 5
pic. 6/7
pic. 8
pic. 9
pic. 10
V06

Publicidad

loading