SMART+PH SYSTEMS (52569, 52570, 52571)
Besides the internal flow detector (gas detector) installed in all Astralpool Chlore equipment, the Smart+ range systems have an additional
mechanical flow detector (flow switch).
1.
Glue the sensor holder to a section of the pipe at the entrance to the electrolysis cell. It should always be installed in a horizontal
position relative to the ground (see Fig. 4), so that the threaded inlets (1/2" - 3/8") are always accessible for the later installation of
the dosage pump injector and the ground connection (optional).
2.
Install the flow detector (flow switch) supplied vertically in the sensor holder supplied with the equipment (Fig. 10b).
3.
There is an arrow on the head of the flow detector. Make sure that this arrow is parallel to the pipe shaft and pointing in the
direction that the water flows (Fig. 11b).
4.
Do not install the flow detector near magnetic objects. They could affect the operation of the magnetic device it contains and
reduce its reliability.
4.5. Installation of the pH sensor (only in Smart+PH systems)
1.
Insert the pH sensor into their corresponding places of the holder (Fig. 12)
2.
Loosen the connection screws and insert the sensor into the holder.
3.
The sensors must be installed in the holder so that it is guaranteed that the sensors located in their ends are always submerged in
the water circulating through the pipe.
4.
Always install the sensor vertically or with a maximum inclination of 40
Fig. 10b
Fig. 12
o
(Fig. 13).
8
Fig. 11b
Fig. 13