8. Electrical Wiring
<XL-module>
• Wiring on the left side and installing the wiring cover
[Fig. 8.1.0.1]
<A> Cut the tie band that fixes the cover of the unit wiring,
and remove the cover.
<B> Remove the water-proof cap from the unit wiring
connector (the male end of the connector).
<C> Pull up the panel heater wirings so that the wirings run
along the left rear pillar.
<D> Connect the panel heater wiring and the unit wiring, and
run the connected wiring between the fin guard and the
pillar.
<E> Place the cover back and fix the cover with the tie band.
A Unit wiring
B Cover
C Tie band
D Water-proof cap on the unit wiring connector
E Panel heater wiring
F Fin guard
G Pillar
[Fig. 8.1.0.2]
<A> Screw down the metal sheet wiring cover and the fin
guard at three points.
A Fin guard
B Cover wiring 1
C Cover wiring 4
D Cover wiring 2
• Wiring on the right side and installing the wiring cover
[Fig. 8.1.0.3]
<A> As with <A> and <B> in [Fig.8.1.0.1], remove the water-
proof cap from the unit wiring connector.
<B> Pull up the panel heater wirings so that the wirings run
along the right rear pillar.
<C> Connect the panel heater wiring and the unit wiring, and
run the connected wiring between the fin guard and the
pillar.
<D> As with <E> in [Fig.8.1.0.1], place the cover back and
fix the cover with the tie band.
A Unit wiring
B Cover
C Panel heater wiring
D Fin guard
E Pillar
F Tie band
[Fig. 8.1.0.4]
<A> Screw down the metal sheet wiring cover and the fin
guard at three points.
A Fin guard
B Cover wiring 1
C Cover wiring 3
• Wiring on the right and left rear sides and installing the
wiring cover
[Fig. 8.1.0.5]
<A> As with <A> and <B> in [Fig.8.1.0.1], remove the water-
proof cap from the unit wiring connector.
<B> Pull up the panel heater wirings so that the wirings run
along the rear pillar.
<C> Connect the panel heater wiring and the unit wiring, and
run the connected wiring between the fin guard and the
pillar.
<D> As with <E> in [Fig.8.1.0.1], place the cover back and
fix the cover with the tie band.
A Unit wiring
B Cover
C Panel heater wiring
D Fin guard
E Pillar
F Tie band
[Fig. 8.1.0.6]
<A> Screw down the metal sheet wiring cover and the fin
guard at three points.
A Fin guard
B Cover wiring 1
C Cover wiring 2
D Cover wiring 3
<EXL-module>
• Wiring on the left side and installing the wiring cover
[Fig. 8.1.1.1]
<A> Cut the tie band that fixes the cover of the unit wiring,
and remove the cover.
<B> Remove the water-proof cap from the unit wiring
connector (the male end of the connector).
<C> Pull up the panel heater wirings and relay wirings so
that the wirings run along the left rear pillar.
<D> Connect the panel heater wiring, the relay wiring, and
the unit wiring, and run the connected wiring between
the fin guard and the pillar.
<E> Place the cover back and fix the cover with the tie band.
<F> Wrap the cover around the connector connection and
fix it with the tie band.
A Unit wiring
B Cover
C Tie band
D Water-proof cap on the unit wiring connector
E Panel heater wiring
F Relay wiring
G Fin guard
H Pillar
I Cover (Supplied)
[Fig. 8.1.1.2]
<A> Screw down the metal sheet wiring cover and the fin
guard at six points.
A Fin guard
B Cover wiring 1
C Cover wiring 4
D Cover wiring 5
25