Best WPB9 Serie Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL THE DUCTWORK
NOTE: To reduce the risk of fi re, use only
metal ductwork.
1. Decide where the ductwork will run
between the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most effi ciently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect 10"
round metal ductwork to cap and work back
towards hood location. Use duct tape to
seal the joints between ductwork sections
(Fig.4).
DECORATIVE
FLUE
HOOD
24" TO 36" ABOVE CO-
OKING SURFACE
- 8 -
ROOF CAP
10" ROUND DUCT
10" ROUND
ELBOW
FIG.4
WALL
CAP

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Wpb9iqt48sb

Tabla de contenido