INSTALLATION
WALL DRILLING AND BRACKET FIXING
A
(2)
B
B
(OPCIONAL)
C
(3)
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area
in which the hood is to be fitted.
A horizontal line A at 1320 – 1700 mm above the cooker top.
A horizontal line B at a minimum 926 (868 optional) mm above the cooker top.
A horizontal line C at a minimum 656 mm above the cooker top.
Mark Points:
Mark a point (1) on the horizontal line A, 60 mm to the vertical reference line.
Repeat this operation on the other side, checking that the two marks are
leveled.
Mark a point (2) on the horizontal line B, 80 (135 optional) mm to the right of
the vertical reference line.
60
(1)
60
80
80
135
135
80 80
Vertical reference line
12
7
21
10
20
10
Opcional
10
11
11
11
V.6