Greenlee 5702 Manual De Instrucciones página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation —5702 Phase Sequence Indicator
Identifying the Phase Sequence of the Circuit
1. Shut off and lock out power.
2. Attach the red, white and blue leads of the 5702 to the three phases of the
circuit.
3. Energize the circuit.
4. Read the tester:
• All of the phase indicators (L1, L2 and L3).
If any of these do not illuminate, have the wiring repaired by a qualified
electrician.
• If the meter indicates clockwise, tag the phases red, white and blue to
correspond with the leads.
• If the meter indicates counterclockwise, shut off and lock out the power
and switch the red and white leads. Energize the circuit. The meter will
now indicate clockwise.
8
Electric shock hazard:
Contact with live circuits can result in severe
injury or death.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5123

Tabla de contenido