Descargar Imprimir esta página

Palram Skylight Shed 6x12 Instrucciones De Montaje página 9

Publicidad

IMPORTANT
Please read
these instructions carefully before you start to assemble this
product
.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep
these instructions
in
a
safe
place for
future
reference.
Safety Advice
For
safety purposes we
strongly recommend the product to
be assembled by at least
two
people.
Some parts may have sharp edges.
Please
be careful
when handling components. Always wear gloves,
eye
protection,
and long sleeves when assembling or
performing
any
maintenance
on
your product.
Do
not attempt to
assemble
the product
in
windy
or
wet conditions.
Do
not attempt to
assemble
the product if
you
are
tired,
have taken drugs,
medications or alcohol, or
if
you are
prone to dizzy
spells.
Dispose
of
all
plastic bags safely
-
keep
them
away
from children's
reach.
Keep
children
away from the assembly
area.
When using
a
stepladder
or
power tools, make sure that
you are
following
the manufacturer's safety advice.
Do
not climb
or stand on
the
roof.
Do
not
hang or lay on
the
profiles.
Heavy
articles should not
be leaned against
the
poles.
Keep
roof
and
gutters
clear
of
snow,
dirt
& leaves.
Heavy
snow load on the roof
can
make it unsafe to stand
below
or nearby.
Do
not
lean
against
or push
the product during construction.
Hot items such
as
recently
used grills,
blowtorches
etc.
must not
be
stored inside the product.
Note:
This
product
must
be
anchored
on to
a
leveled surface and solid
foundation to
ensure
its
stability.
Make sure
that
screws and anchors are
compatible with foundation
type. Make sure
that there
are no
obstructions between the
assembly
area
and
the final position.
Cleaning Instructions
In
order to
clean
the product,
use
a
mild detergent solution
and rinse
with
cold
clean water.
Do
not
use
acetone, abrasive cleaners, or other special detergents to
clean
the
panels.
Clean
the product
once assembly
is
complete.
Before
Starting Assembly
Choose
your site carefully before beginning
assembly.
The
ground
surface must be
perfectly flat
and leveled and have
a
solid
base such
as
concrete,
asphalt, deck
etc.
Complete
site
preparation before unpacking
parts and
beginning
assembly.
Sort
the
parts and check against
the content
parts list.
Parts
should
be laid
out
close at hand. Keep
all
small parts (screws etc.)
in
a
bowl
so
they do not get
lost.
Please
consult your
local
authorities if
any
permits
are
required prior to constructing the product.
During Assembly
MWhen
encountering the information
icon, please refer
to the relevant assembly step
for additional comments
and assistance.
This icon indicates
that
the installer should
be
inside the product.
Attention
Step
3:
Place
the back wall panel on the shed
base panel
according to the
stamped
serial
number
(part #7699).
Step 30:
Please
apply silicone (caulk)
sealant at
the connection between both
Aluminum profiles
(diagram
b), in
order to prevent water from seeping
in.
Step 41, 42: Note that
panels and profiles are
connected
in
the right direction
and
that profile
holes
are
placed
correctly
as
illustrated.
Step 44:
Push
aluminum profiles against part #8439
and then
use
Self-Drilling
screws
(#4045) to connect to the profile
(diagram
b).
No
pre holes
are
needed.
Step 50: Anchor the
shed on
to
a
solid surface
such
as
concrete, asphalt or wood deck;
use
suitable
screws and plugs. (Screws and plugs are
not supplied).
This icon
indicates
that
the
11
installer should
be
outside
the product.
*Tighten
all
screws
when completing
assembly.
Do
not tighten
screws and
nuts
(411 &
466)
until completion
of
assembly
process.
These
2
icons
indicate if
screws'
tightening
is
required
or not.
A
Note: Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be valid.

Publicidad

loading