A.
IMPORTANT
1. PEOPLE OTHER THAN THE OPERATOR MUST KEEP A SAFE DISTANCE
FROM THE UNIT WHILST IT IS OPERATING.
2. NEVER STAND ON THE PLATFORM.
3. NEVER EXCEED THE MAXIMUM LOAD LIMIT.
4. NEVER LOAD THE PLATFORM ON ONE SIDE OR MAKE IT TOP-HEAVY
OR PLACE LOADS THAT STICK OUT OVER THE EDGE OF THE
PLATFORM.
5. NEVER INSERT YOUR HAND OR FOOT BETWEEN THE PLATFORM AND
THE BASE FRAME.
6. LOWER THE LOADED PLATFORM SLOWLY.
7. THE PLATFORM MUST BE LOWERED IN FULL FOR TRANSPORT.
8. BEFORE LOADING AND UNLOADING ALWAYS APPLY THE PARKING
BRAKE.
9. ONLY RAISE AND LOWER THE PLATFORM WHEN THE UNIT IS
HORIZONTAL.
10. DO NOT USE THE UNIT IS ITS LOWERING SPEED BECOMES IRREGULAR
OR EXCESSIVE.
11. THE UNIT MAY ONLY BE INSTALLED ON A FLAT SURFACE AND AFTER
BLOCKING THE ROLLERS SO AS TO PREVENT THE UNIT ROLLING
AWAY SUDDENLY.
II.
Installation
HTF 15
1)
Insert pedal(76) into Pedal holder(64), then fixed by Hex bolt(78)
HTF 25 / HTF 25 E / HTF 50 / HTF 75 / HTF 75 E / HTF 100 / L / LE
1)
Put the handle (64/62/63) on chassis, and fixed from chassis bottom via Hex
screws(67/65/66).
2.)
Fixed release wire (57/55/56) on chassis slot (90-1/43-1/44-1)via screws(57-1), the chassis
slot(90-1/43-1/44-1) should be located between two washers (57-2/55-2/56-2).
3.)
Take off split pin (68/66/67), then take out pin (69/67/68) from U slot (57-3/55-3/56-3).
4.)
Make the U slot (57-3/55-3/56-3) and lever (52/50/51) together via pin(69), then insert split
pin (68/66/67) into the small hole of pin (69/67/68) to fix.
5.)
Insert foot pedal (73/71/72) into Shake link (75/73/74), fixed by Hex screw (77/72/73).