Drill Through-Hole In Outdoor Wall - Hessaire H Serie Instrucciones De Instalación

Ca mini-split sin conducto
Ocultar thumbs Ver también para H Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor Unit Installation: 4.3 Drill Through-Hole In Outdoor Wall
Drilling Hole Through Wall To Exterior:
It is necessary to drill a 3" hole in the wall to pass refrigerant piping, drain tube and signal cable through wall to
exterior.
Determine the location of the 3" hole based on the location of the mounting plate. Refer to Fig. 4.3 on this page
for accurate hole location based on unit size. Note: Bottom of 3" hole should not drop below bottom edge of wall
mount bracket. Dropping the hole lower than the bottom edge will result in the indoor unit not completely cover-
ing the hole. (If rerouting the exit position of the refrigerant piping, drain tube and signal cable differently from
pre-set factory orientation, ensure 3" wall hole is covered by unit where possible).
Using a 3" hole saw, drill hole from interior wall through to exterior of building. Drill hole at slight downward angle
towards the outside. See Fig. 4.3b on this page. Note: If installing through concrete or brick, special drill & drill
bits will be required.
Fig. 4.3
Table of Wall Hole mounting dimensions
Model
Number
H12E1 (1 Ton)
H18E2 (1.5 Ton)
H12HP1A (1 Ton)
H18HP2A (1.5 Ton)
Indoor Unit Outline
When drilling wall hole, be sure to avoid electrical wires, plumbing and wall studs.
Dim.
Dim.
A
B
2.75"
1.5"
6.7"
1.5"
2.75"
1.5"
5.4"
1.5"
Dim.
C
3"
3"
3"
3"
Drill 3" hole at
slight downward
angle to ensure
proper drainage.
3" Through
Wall Hole
6
Skill Level
Fig. 4.3b
Interior
Wall
1
Exterior
Wall
2 - 3 degree
downward
angle

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Hessaire H Serie

Este manual también es adecuado para:

H12e1H18e2H12hp1aH18hp2a

Tabla de contenido