(III) INSTALLING THE POP-UP:
• The plunger may be installed in E-Z Kleen or Vandal
Proof mode.
• For E-Z Kleen, install the plunger after the ball & rod
assembly is installed and secured.
• For tamper resistant mode, insert plunger into drain body
assembly and insert the tip of the ball & rod assembly
through the loop on the end of the pop-up as shown.
• Place the ball rod washer over the ball & rod assembly and
secure with the provided nut.
• Thread in the tailpiece.
III
(IV) ADJUSTING THE POP-UP
• After installing the ball & rod assembly, assemble the
spring clevis, extension assembly and the pop-up rod as
shown with the plunger open, adjust the components
of the assembly so about 5/8" (16mm) of the pop-up
rod is visible between the faucet body and the pop-up knob.
• Insert tailpiece into a P-trap/drain and secure with trap nut.
• Check for leaks at all fittings.
IV
& DRAIN:
PROFESSIONALLY MADE. PROFESSIONALLY SOLD.
PROFESSIONALLY INSALLED.
Gerber Plumbing Fixtures LLC.,
www.Gerberonline.com