1. Prepare the Site
Finished Floor
NOTICE: Measure your product for site preparation. Note the model number on the packaging label, then visit the
product page at
kohler.com
NOTICE: Provide adequate floor support.
Determine the location of the bath.
Position the bath so that the overflow side of the bath faces the preferred direction.
Make sure the subfloor is level and offers adequate support for the bath.
Verify that the finished floor is level before proceeding.
Brass Installation
Insert the drain body into the bath.
Measure the distance "X" between the bottom of the drain body and the floor.
Cut the pipe to extend "X" height above the floor.
PVC Installation
Insert the drain body into the bath.
Thread on a 1-1/2" 11-1/2 NPSM PVC adapter.
Measure the distance "X" between the bottom of the adapter and the floor.
Cut the pipe to extend "X" height above the floor.
1439247-2-B
for more information.
4
Drain
Pipe
X
Kohler Co.