3. Place shelf (3) on brackets. Secure shelf to brackets
with four 5/8" bolts and M6 flange nuts. (See Figure 11)
Figure 11
Shelf
M6 Flange Nuts
PEGBOARD AND LOUVERED PANEL
ASSEMBLY
1.
Position panel mounting bars (6) at desired height
on the uprights. There should be eight open holes
on the upright between the top and bottom bar to
allow for panel mounting. Secure bars to upright with
four M6 x 40 mm bolts. (See Figure 12)
NOTE: The holes on the face of the mounting
bars should be facing front of workstation.
Figure 12
Panel Mounting Bars
2. Attach panel brackets (7) to pegboard panel (4) or
louvered panel (5). Line up holes on bracket with
the four holes on the ends of the panels. Attach four
M6 x 15 mm bolts and M6 flange nuts on the center
holes only. (See Figure 13)
Figure 13
PAGE 5 OF 24
OPTIONAL ACCESSORIES CONTINUED
5/8" Bolts
M6 x 40 mm Bolts
Panel Bracket
Panel
3. Install panels (4 and/or 5) to the mounting bars (6).
Line up holes on the top and bottom of the panel with
the holes in the bar. Secure using four M6 x 40 mm
bolts and M6 flange nuts. (See Figure 14)
Figure 14
M6 Flange Nut
M6 x 40 mm
Bolt
4. Repeat for additional panels. The 48" workstation
holds up to 2 panels, 60" and 72" workstations hold
up to 3 panels.
5. Assembly is complete. (See Figure 15)
Figure 15
Completed Assembly
0322 IH-9635