3M PROTECTA Rebel Manual De Instrucciones página 14

Ocultar thumbs Ver también para PROTECTA Rebel:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 39
Serial Number(s):
Model Number:
Inspected By:
Component:
Inspection:
SRL(s)
Inspect for loose bolts and bent or damaged parts.
(Figure 9)
Inspect Housing (A) for distortion, cracks, or other damage.
The Lifeline (B) should pull out and retract fully without hesitation or creating a slack line condition.
Ensure device locks up when lifeline is jerked sharply. Lockup should be positive with no slipping.
The labels must be present and fully legible (see Figure 14).
Look for signs of corrosion on the entire unit.
Connectors
Inspect Snap Hooks, Carabiner, Rebar Hooks, etc. for signs of damage, corrosion, and proper working
(Figure 10)
condition. Where present: Swivels (A) should rotate freely, and Carabiner and Hook Gates (B) should
open, close, lock, and unlock properly.
Lifeline Webbing and Stitching
Inspect webbing; material must be free of cuts (A), frays (B), or broken fibers. Check for tears,
(Figure 11)
abrasions, heavy soiling (C), mold, burns (D), or discoloration. Inspect stitching; Check for pulled or
cut stitches. Broken stitches may be an indication that the harness has been impact loaded and must
be removed from service.
Energy Absorber
Verify that the integral Energy Absorber has not been activated. An open cover or torn cover (A),
(Figure 12)
webbing pulled out of the cover, torn or frayed webbing (B), ripped stitching, etc. are indicators of an
activated Energy Absorber.
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Table 3 – Inspection & Maintenance Log
14
Date Purchased:
Date of First Use:
Inspection Date:
Before
Each Use
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Competent
Person

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

310041831004193100420310042131004453100422

Tabla de contenido