OUT-LINE OF INSTALLATION
Installation
Requirements
unit ............................................ 4
of piping ................................... 6
For right rear piping
Required Parts
Level gauge
Screw driver
Electric drill
Hole core drill(ø70mm)
Pipes: Gas side ....... 1/2", 3/8",
5/8", 3/4"
Liquid side .... 1/4", 3/8"
(Refer to page 4)
Insulation materials
Additional drain pipe
(Outer Diameter ....... 15.5mm)
Two type "B" screws
2
Required Tools
Installation plate
Four type "A" screws
Connecting cable
Flaring tool set
Specified torque wrenches
1.8kg . m, 4.2kg . m, 5.5kg . m,
6.6kg . m
(different depending on model No.)
(Refer to page 10)
Spanner..................Half union
A glass of water
Screw driver
Hexagonal wrench(4mm)
Gas-leak detector
Vacuum pump
Gauge manifold
Owner's manual
Thermometer
Holder Remote Control