CEMO PE collection tray 250 / 2
Accompanying documents and technical
information Approval no.: Z-40.22-420
1. „Operator excerpt" approval
2. Transport, assembly and
operating instructions
3. Monitoring statement
Important documents for the operator!
Please keep in a safe place!
(The documents must be presented when the tank
system is being inspected.)
1. Approval „OPERATOR EXCERPT"
This is a translation of the German original document and
has not been reviewed by the German Institute for Struc-
tural Engineering.
DEUTSCHES INSTITUT FÜR BAUTECHNIK (GERMAN
INSTITUTE FOR STRUCTURAL ENGINEERING)
An institution of public law
10829 Berlin, 24th January 2008
Kolonnenstraße 30 L
Tel: 030 78730-345
Fax: 030 78730-416
Company reg. no.: 155-1.40.22-75/07
General Construction Inspection Approval
Approval number:
Z-40.22-420
Applicant:
Chemowerk GmbH
In den Backenländern
71384 Weinstadt
Object of approval:
polyethylene (injection moulded) collection tray
model „PE collection tray 250/2"
Valid until:
30th January 2013
The above named object of approval is hereby granted General Con-
struction Inspection Approval. This General Construction Inspection Ap-
proval comprises eight pages and four attachment notes.
Page 2 of the General Construction Inspection Approval no. Z-40.22-420
of 24th January 2008
1
The General Construction Inspection Approval certifies that the ap-
proved object is suitable and useful in the sense of the construction
regulations of the German states.
Page
9 - 12
2
The General Construction Inspection Approval does not replace the
Page
13
permits, permissions, and certifications legally required for a con-
Page
13
struction project
3
The General Construction Inspection Approval is granted without
affecting the rights of third parties, in particular private proprietary
rights.
4
Manufacturers and sellers of the approved object must make copies
of the General Construction Inspection Approval available to users
of the approved object and point out that the General Construction
Inspection Approval must be present at the place the object is used.
This provision does not affect the further regulations in the „Particu-
lar Regulations". If requested, copies of the General Construction
Inspection Approval must be made available to the authorities in-
volved.
5
The General Construction Inspection Approval may only be repli-
cated in its entirety. Publication of excerpts requires permission from
the German Institute for Structural Engineering. Text and drawings
in advertising must not contradict the General Construction Inspec-
tion Approval. Translations of the General Construction Inspection
Approval must contain the notice: „This is a translation of the Ger-
man original document and has not been reviewed by the German
Institute for Structural Engineering".
6
The General Construction Inspection Approval, is granted subject to
revocation. The regulations of the General Construction Inspection
Approval are subject to subsequent additions and changes, espe-
cially when new technical knowledge necessitates them.
I. GENERAL REGULATIONS
GB
9