Installing the C-Level
The IFS control panel operates with a C-Level™ sensor and 1 or 2
recommended oat switches or with 3 to 4 oat switches. For C-Level™
sensor operation, C-Level™ sensor operates the Pump Start, Stop and
Alarm functions and the back-up oat switches are for redundant o and
high level alarm. For oat switch operation, the oat switches operate the
Pump Start, Stop and Alarm functions.
Ensure all supply power to the control panel
is turned OFF before installing or servicing
the C-Level™ sensor, oat switches or pumps
in the tank. Failure to do so could result in
serious or fatal shock.
O
Timed Dose
Simplex/Duplex
Timer Override
(optional)
Alarm
Timer Enable
Redundant O
(optional)
Tighten
the
clamp.
Hose clamp is 18-8
stainless steel.
E2
Sensor & Float Switches
NOTE
Do not splice the C-Level™ sensor
cable.
Do not run C-Level™ sensor cable
or oat switch cables in the same
conduit as the pump cables.
Power from Breaker
Float Switch Installation
Simplex
Alarm
Start
Stop
Make sure hose clamp
band does not interfere
with oat operation.
Floats require free range of motion.
3.5"
They must not touch each other or
(9cm)
any equipment in the pump chamber.
Do not install cord under
hose clamp.
Mounting the Control Panel
Demand Dose
Duplex 3-Float
Duplex 4-Float
Lag/Alarm
Start
Stop
Lag
Alarm
Start
Stop