Operation Elements; Functional Test; Rccb Test - BEHA UNITEST Schuko-Fix Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.1 Operation Elements

1) Mains plug (schuko system)
2) LED for contact voltage >25V
3) "Ready" LED
4) "Test"-key
5) Rotary-switch for for setting
nominal trip current
6) Contact-elektrode
7) LC-Display
7
6

4.2 Functional Test

Prior to any measurement, a functional instrument test has
to be carried out on an operational UUT. This could be a cor-
rectly wired socket, possibly equipped with an RCD, with is
known to function perfectly.

4.3 RCCB Test

In case the Schuko plug (1) is connected with correct pola-
rity to the test object (socket), the LED 'Ready' (3) lights up
red.
By means of the rotary switch (5), select the appropi-
ate nominal current (dependends on RCD)
Connect the Schuko plug (1) correctly polarised to the
socket.
2
3
4
5
1
13

Publicidad

Tabla de contenido
loading

Tabla de contenido