Flush Mount Installation Instructions
2. Install deflector as shown in Figures 10 and 11
Shelf detail showing the deflector vent during
installation. Position deflector vent and mark holes.
Pre drill using a 1/16" bit before mounting.
Figure 10
Shelf detail showing the deflector vent installed.
Figure 11
3. Place the drawer adjacent to the wall or cabinet.
Plug the power supply cord into the electrical
outlet.
4. Loop (do not tie) a 36" (91 cm) string around the
power supply cord before the drawer is slid into
place. This will keep the cord from falling behind
the drawer.
5. Lift drawer into cabinet cutout using the opening
as a grip. Carefully guide the drawer into the
prepared opening.
6. As you slide the drawer back, pull the string so
that the cord will lie on top of the drawer in a
natural loop and avoid pinching the cord between
the drawer and the wall.
31-7000166 Rev.0
7. When you are sure the cord is out of the way, slide
the drawer ¾ way back into the opening. Remove
the string by pulling on one end of the loop.
8. Slide the drawer all the way back until the
mounting flanges touch the cleats in the cabinet
opening.
9. Open the drawer. Using the 4 holes on the
mounting flanges as a template, drill pilot holes the
cabinet using a 1/16" drill bit. See Figure 12.
Figure 12
10. Secure the drawer with the 4 screws supplied.
It is recommended that the screws be hand
tightened.
Mounting
Flange
7