Descargar Imprimir esta página

DHC BT2400 Manual Del Propietário página 12

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 71
System
Test
7.
Select NEXT when idle test is completed and move on to the ripple & load
on test.
8.
Turn on loads and rev engine for 15 seconds.
(The BT2400 will countdown 15 seconds)
Turn on loads.
System
Test
9.
Once completed, the ripple & load test results are displayed.
Ripple Test
Ripple Voltage
System
Test
Alt. Idle Test
Mke sure all
loads are off
<<NEXT>>
Ripple Test
<<NEXT>>
Normal
0.12V
<<NEXT>>
Alt. Idle Test
Idle Voltage
System
Test
Rev the engine up
System
Test
Alt. Load Test
Load Voltage
System
Test
12
Normal
13.87V
<<NEXT>>
to 2,500rpm for
15 seconds.
Normal
13.93V
<<NEXT>>

Publicidad

loading