Harness User's manual | ACCESS 2 BUMP
INSTALLING THE RESERVE PARACHUTE
Locking the reserve parachute handle
Mandatory extraction test procedure
Check the completed
installation during a
hang-test.
Have the installation checked by a professional outfit.
As the volume of the folded parachute may vary, check the proper
functioning of the parachute pocket during an extraction test. It is
necessary to perform this test every 6 months.
Note :
Conducting and extraction test does not imply deploying the reserve
parachute which will stay inside its POD.
10
- Turn down the upper flap in its storage
ACCESS 2 BUMP | page 23