How to Install:
1. Make sure that the pool wall has an even thickness where the nozzle is to be installed.
Recommended depth for the lamp is 300–800 mm down from the pool edge.
Make a hole in the structure according to the dimensioned drawing. (The sealing rig can be used as a template, aligned as
shown in the drawing.)
2. Grind the surface even at least 30 mm around the large hole on the rear side of the pool wall. The sawed surface shall be
sealed with a hard plastic, e.g., Polyester or Epoxy.
3. Attach the self-adhesive gasket onto the flange.
4. Apply an even layer of silicone, approximately 2 mm thick onto the gasket and on the ground surface around the hole in the
pool wall. Also apply silicone in the drill hole.
5. Screw together the flange with the sex countersunk screws (A).
The flange with the self-adhesive gasket against the rear side of the pool wall and the sealing ring with the gasket under the
pool wall from the inside of the pool.
Put the screws in place and tighten them transversely. N.B.! The length of the screws depends on the thickness of the pool
wall, see table.
6. Wipe off any excess silicone.
7. Install the plug on the rear edge of the flange. If an O-ring is being used, no other seal is necessary.
8. Install the cable bushing in the plug. Use the included O-ring and make sure that it is resting in the correct location.
No further sealing is needed.
9. Thread the cable through the cable socket fitting and pull it out at the front side of the flange.
10. Thread the sealing grommet onto the cable. The sealing grommet must be placed in the rubber on the cable socket fitting.
11. Attach the LED module on the cable in accordance with the instructions on page 13.
12. C arefully pull the LED module cable on the flange.
13. Make sure that the sealing grommet is placed in the rubber on the cable socket fitting.
Tighten the cable socket fitting so the the cable rests firmly in place.
N.B.! Leave a sufficient length of cable free on the
rear side of the pool wall or in the connection box
for future service or any winter closure.
14. Clamp the LED module in place with the front.
Tighten it in place with two screws
15. Fill the pool with water to the desired level.
B
T. Thickness of the pool wall
2 mm
4mm
6 mm
8 mm
10 mm
12 mm
14 mm
16 mm
A
C
A. Screw (6pcs)
Marine
Classic
L = 20 mm
L = (16) 20 mm
L = 20 mm
L = 20 mm
L = 25 mm
L = 20 mm
L = 25 mm
L = 25 mm
L = 25 mm
L = 25 mm
L = 30 mm
L = 30 mm
L = 30 mm
L = (35) 30 mm
L = 35 mm
L = 30 mm
17
B. Screw (2pcs)
Marine
Classic
L = 25 mm
L = 20 mm
L = 25 mm
L = 25 mm
L = 30 mm
L = 25 mm
L = 30 mm
L = 25 mm
L = 30 mm
L = 30 mm
L = 35 mm
L = 30 mm
L = 35 mm
L = (30) 35 mm
L = 35 mm
L = 35 mm
ENGLISH
C. Support
1 st
1 st
2 st
2 st
2 st
2 st
2 st
2 st

Publicidad

loading

Este manual también es adecuado para:

124845125845124846125846124847125847