Descargar Imprimir esta página

Titan T8000 Guia Del Usuario página 40

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Cross the PCB board, headlight board and the two motor wires through the middle cover
and replace the middle cover on the base. Make sure both the two felt washers are
covered completely by the middle cover. Replace the nozzle power cord back into the
cord channel.
Motor Wires
8. Check that the two latches in the handle area are locked into position as shown. Make
sure there is no gap between the middle cover and base.
Nozzle
Power Cord
Latch
-40-
Middle Cover
PCB Board
Headlight Board
Latch

Publicidad

loading