Descargar Imprimir esta página

Signs/Labels; Design; Hinges/ Bearings - Novoferm NovoDock L530 Traducción Del Manual De Funcionamiento Original

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 68
Check these options, if available:
– automatic return to the resting position
– locking of door/dock leveller (sensor) or safety
wheel chock
– warning signal system (optical/acoustic)
Carry out a visual inspection on:
– mechanical damages, rust formation and the
condition of the welded construction
– dirt and oil spills in the area underneath the
dock leveller. Remove any if present.
Make sure that no debris, stones etc. obstruct the
function of the hinges.
Provide sufficient slip resistance by keeping the
dock leveller platform clean and dry.
Do not use any aggressive cleaning agents or
thawing salts! Risk of corrosion:
Do not aim a high-pressure water jet at the
control system, the hydraulic system or any
electrical connections!
If you notice damages the dock leveller must be in-
spected by an expert/ a qualified person and must not
be used until the repair work has been completed.
8.3

Signs/labels

Check the signs/labels for completeness, legibility
and condition according to chapter  3.3 and  3.4. La-
bels/rating plate must be replaced as required.
Fig. 7: Lubrication points, illustration may deviate from the product
These assembly, operation and maintenance instructions must be kept for the entire period of use!
8.4

Design

Carry out a visual inspection of the entire steel con-
struction with regard to the following:
mechanical damages to the weld seams
completeness and tightness of the safety
elements and screw connections
deformations and corrosion
condition of the connection to the installation
point
Carry out the following checks on condition and func-
tion:
slip resistance condition of the drivable surfaces
condition of the anti-slip coating/sound-absorbing
coating (optional) of the dock leveller platform
protective plate
maintenance support
screw connection and safety cotter pins of the
hydraulic cylinders
safety cotter pins at the cross rod
all moving parts for ease of movement
If necessary, have the design inspected by an expert/
a qualified person.
8.5

Hinges/ bearings

Lubricate the bearings on the loading bridge platform
through the tapered holes,the bearings of the lifting
cylinders as well as the sliding surfaces on both sides
of the lip leveller with multi-purpose grease (see ar-
rows).
EN - 41

Publicidad

loading