Descargar Imprimir esta página

Hoisting - Zodiac NZO 760 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The hoisting operations can also be carried out by passing suitable lifting straps beneath the
hull (at X: 0.5 metre and Y: 4.8 metres from the base of the aft transom).
X
WARNING
WARNING
CAUTION
HANDLING - Hoisting
Y
DEFLATE THE BUOYANCY CHAMBER FOR THIS OPERATION.
THE FORWARD AND AFTER TOWING CHAIN PLATES MUST
NEVER BE USED AS LIFTING POINTS.
PLEASE REQUIRE THE ASSISTANCE OF HOISTING SPECIALISTS.
ALL EQUIPMENT MUST BE UNLOADED FROM THE BOAT FOR

HOISTING.

BEFORE LAUNCHING THE BOAT, OPEN THE DRAIN HOLE TO
DRAIN ANY RAINWATER FROM THE COCKPIT (CLOSE THE
DRAIN HOLE AGAIN BEFORE LAUNCHING)
NO PASSENGERS ON BOARD DURING HOISTING
OPERATIONS

Publicidad

loading