1. Deflate the boat.
2. Put the valve protections back in position for storage.
3. Remove the console and the various equipment items
4. Remove the floorboard (apply the assembly procedure in the reverse order).
5. Empty the boat of all water and sand by opening the self-bailers (dry the boat thoroughly in case of
long storage).
6.
Fold in the 2 sides of the main buoyancy tube (A), fold the cones onto the transom, then roll up the
boat around the transom (C). Start again if you feel there is still some air left in the tubes.
buoyancy tube
tube deflated
Stow the boat in its bags as follows (D):
. In the first bag, stow the floorboard sections and stringers, in the second the buoyancy tube.
. Close the bag and fasten the two front straps.
. Tighten the side ropes (make sure that all equipment stays inside).
. To finish, store the foot-pump in the front pocket.
DAMPING BUOYANCY MECHANISM MAINTENANCE / DISASSEMBLY
MAINTENANCE: We recommend cleaning the damping
buoyancy mechanism regularly to avoid sand or shells
rubbing into the material.
To clean the damping buoyancy mechanism:
1. Deflate the damping buoyancy system
2. Release the lock
3. Hose down the area between the buoyancy mechanism
and the skirt, then lift the nose of the boat to let the water run
out. Repeat the operation until all the sand and has been
removed.
DISASSEMBLY: The damping buoyancy mechanism can be removed completely; however, this
operation requires specific tools and special precautions. For this reason, we recommend you ask
your agent to do it.
DEFLATING / FOLDING THE BOAT
A
floor
C
/ 10
10
B
D