9
1
2
3
Loosen downrod ball (1) from downrod (3) by removing set screw (2).
Slide downrod ball (1) off of downrod and remove pin (4).
Quite el tornillo de ajuste (2) para soltar la bola de la varilla (1) de la
varilla (3). Deslice la bola de la varilla (1) para quitarla de la varilla y
quite el pasador (4).
EXTENDED DOWNROD OPTION
OPCIÓN CON VARILLA VERTICAL MÁS LARGA
4
1
10
Re-install pin into extended downrod, and slide downrod ball up to the top of the downrod.
Re-install set screw to secure ball to downrod. Note: Some extended downrods have a pre-
drilled set-screw hole. If a pre-drilled hole is present in the extended downrod, tighten the set
screw into the pre-drilled hole in the extended downrod. If no pre-drilled hole exists in the
extended downrod, tighten the set screw against the downrod to secure the downrod ball.
PROCEEDTO PAGE 9, STEP 7.
Vuelva a instalar el pasador en la varilla vertical más larga y deslice la bola de la varilla hasta
el extremo superior de la misma. Vuelva a insertar el tornillo de fijación para asegurar la bola
a la varilla vertical. Nota: Algunas varillas verticales más largas tienen un agujero previamente
perforado para el tornillo. Si la varilla vertical más larga tiene un agujero previamente per-
forado, ajuste el tornillo en el agujero previamente perforado de la varilla vertical más larga.
Si la varilla vertical más larga no tiene un agujero previamente perforado, ajuste el tornillo
sobre la varilla vertical para asegurar la bola de la misma. PROCEDA A LA PÁG. 9, PASO 7.
9
ETL-ES-Harmony-WH20